Tilers at Sleeping Indian

Beez Neez now Chy Whella
Big Bear and Pepe Millard
Mon 15 Jun 2020 23:57
Tilers Arrive to do the Deck and Staircase
 
 
P6100031  P6100032
 
 On Monday we met Mr. Tiler (Tito) and Scooby (Roger), too many souls working so the boys came back Tuesday morning. Within minutes they had the first tile down and tamped into place. By five o’clock nearly all the deck was covered.
 
P6110007
 
On Wednesday Scooby carried on with the deck.
 
P6110008  P6110009
 
Scooby mixing up a batch of thin set for Mr. Tiler.
 
P6110011  P6110016
 
Mr. Tiler doing some early pondering a few hours later the upper staircase was coming along. Bear brought the ladder indoors and set it up from one of the middle lower stairs making it just a short climb to the banister outside our bedroom.
 
P6120044
 
Friday saw Mr. Tiler rounding the easy turn.
 
P6120046
 
Friday gave me the best view as Scooby was sticking the front face tiles up. After lunch Scooby began grouting and in double-quick time half the grouting had been done row by row.
 
P6120047  P6120052
 
Catching Mr. Tiler in the act. Tito left the bottom three stairs untiled so we could once again use the ladder indoors. At four thirty the boys were doing a final clean up. The deck looks super, really super.
 
P6120056
 
After a days work the boys clean themselves up - Scooby washing his legs.
 
P6130003 - Copy  P6130004 - Copy
 
Saturday morning was incredibly hot so Bear unrolled the canopy to stop the grout drying too quickly. On Scooby went, once again row by row.
 
P6130005 - Copy
 
I bimbled in at one point to find Mr. Tiler looking cool with his shades on, when I told him he graced me with a wonderful smile.
 
P6130004  P6130003  P6130008
 
By the end of the day Mr. Tiler had finished the upper stairs, inner and wall strings, began working on the wall string on the easy turn and bottom four stairs. This meant that we could use the stepladder to cock our legs over the lower bannister and step above the Coke bottle. Sadly, we had to say farewell to Scooby but Tito we would see on the morrow.
 
P6130059
 
We woke on Saturday morning for our first look at the finished patio. Mr. Tiler came early and cut all the tiles for the rest of the job, unhappy with one of the uppers, off it came and was replaced. Such a careful, steady worker who worked until late and we would see him again bright an early on Monday.
 
P6150008
 
Early Monday morning Mr. Tiler arrived with Melissa (not only his friend but also the team grouter for more than ten years), Bear immediately thought that her name was Stacey...... Overnight the kitchen tiles had dried and I felt the grout was too dark, therefore too dominant for the staircase tiles. We caught Bossman on his way to see us for our daily visit, he very kindly turned and went to the tile shop. Meanwhile, I rang said shop and paid for a bag of ‘silver’ (pale grey). Melissa was incredibly patient then got to work at once. Mr. Tiler very carefully finished and both were being ‘hugged’ and thanked profusely by late afternoon. Final pictures would wait until the grout was dry.
 
P6160008  P6160009  P6160010
 
On Tuesday morning we were thrilled with the result (bottom, middle and top). We need to add a wood strip, paint the top grout white to blend in to the walls and complete the bannisters to declare the job complete but for now, we have a gorgeous, clean-looking staircase.
 
 
ALL IN ALL QUICK, EFFICIENT AND VERY HAPPY CHAPS
                     NEAT WORKERS