Sleeping Indian Work Week One

Beez Neez now Chy Whella
Big Bear and Pepe Millard
Fri 29 May 2020 23:57
A Very Busy, Productive Week and Such Changes
 
 
P5260001
 
Yesterday, Day One was obviously the most dramatic in terms of deconstruction but Tuesday saw the shuttering prep work each side of the front pilings. The boys are a hard-working, happy bunch and we love to hear them chatter. Extremely respectful (not for our benefit) when they talk about the boss always using Mr. Drysdale. By the end of the day all the wooden, support beams were in place.
 
P5270010
 
Wednesday saw Barry White (Baldwin) with the ‘Big Boy’ tool trimming down the piling.
 
P5270016  P5270017
 
Cutie (Benji) carried in sheets of ply as if they were ice cream wafers as Captain (Lashley) nailed them in place. It is wonderful to watch as they seamlessly take charge of their respective jobs, nary a word needed to be spoken, no one bothered who was ‘in charge’ of a particular job so long as it was completed....
 
P5270018
 
I simply love this picture.
 
P5270020
 
Captain happily nailing away.
 
P5270021
 
By days end we had a dance floor.
 
P5280022
 
Thursday saw Captain ‘trimming’ the ‘i’ bar and making sparks.
 
P5280003  P5280005
 
Said ‘I’ bar hefted in by the team and .......
 
P5290008
 
............we could clearly see the extension to the front right.
 
P5290011
 
Friday - the rods went in for the cement strengthening. At 12:45 the concrete man came to measure up, six cubic yards are coming on Tuesday after Bank Holiday Monday (no one allowed on the beach). We sent the boys off with six beers each to enjoy and bade them a good, long rest. Captain went off beaming with the bed head and chopped off foot as his weekend project.
 
 
 ALL IN ALL A REAL JOY TO WATCH AND BE WITH SUCH A SMASHING TEAM