Getting There

Today’s jobs: started sanding below the waterline and finished dismantling the windvane with the help of David and his workshop. Some of the grub screws were welded in with corrosion and had to be drilled out with David’s drill press (stainless steel and aluminium are not a good mix).

All is well.

Bob Cat:

Still no tuna! zzzzzzzzzzzzzzzzzz