Filling up procedure on a Diesel Duck

We started filling 1.000lit in the aft tank followed by 800lit in each forward tank (tank 1+2). The rest was distributed between the 2 midtanks with some overweight for tank 3 for levelling towards the port side. The whole procedure took 1,5 hours.

JPEG image

JPEG image