Return to Santa Maria de Navarrese

South Pacific Familyadventure 2008
Claes Brodin
Fri 10 Feb 2023 18:05
After a tedious day of travelling by train and three flight connections we landed in Cagliari/Sardinia around midnight. After a two hour taxidrive we were finally back on Dora Mac in Marina Baunei at Santa Maria de Navarrese.
Shore power seemed to be working as well as the Eberspächer heating system so we just went to bed exhausted.
The day after we went through all Dora Mac`s  systems (which were all working flawless when we left in December) which was a disappointment.
-The Tecma front toilet out of order
-Microwave door mechanism broken
-Propane flow to low for cooking
-The 24 volt service battery system (12 OPzV  2 volt gel cells connected in series 17 years old) with low charge allthough on float from Victron charging system
-Sleipner/SidePower bowthruster only responding with mechanical "clicks" when engaged
-Balmar 140A/24V alternator not charging the 24V servicebattery system and along with all this also some minor things.

It seems as if we will have loads of work ahead of us which will obviously include a lot of repairs on top of haul out/bottompaint and everything else which is normally included in every years springrefit.



JPEG image

JPEG image