Managing gales in Milos
South Pacific Familyadventure 2008
Claes Brodin
Sun 22 May 2016 19:25
When passing Adhamas we saw a new breakwater had been built in the form of a "floating bridge", Subsequently we anchored stern to with 2 mooringlines in the bow.
Next morning we had galewinds from SE as expected creating a large swell in the bay. Floatingbridge and all boats were moving heavily but we managed fine with anchor and 2 mooringlines in the bow together with 2 aftropes and springlines. In the afternoon the gale from SE was replaced by a gale from SW force 7-8 (36kts) howling the whole night. Today it´s calm but another gale from the north is coming in tonight. Our new crew Patrik is coming by ferry from Santorini today (weather permitting).
The Australian children on the picture are waiting for their father to pass over to the pier since the floatingbridge is moving to much for a safe passage.