Denia: Euro 2008 semi final
![](/static/images/logos/site-logo.png)
38.50.429N 0.07.131E Wednesday: Today we worked on the boat. In the morning we checked the
deck hardware and lubricated the moving parts. In the afternoon we started work
on the forward shower, and replacing pipes. We managed to get the shower pump
working by the end of the day. We had a quiet evening onboard. Thursday: Today we started work on fitting the new shower – well
to be exact we got the bits out to work out how it would fit and realised we
needed some extra bits. This meant we had to head off into town to our favorite
Ferretería (Hardware store).
Armed with the bits we needed we walked slowly back to the boat (well it was
very warm and far too hot to walk fast). After Lunch and a short siesta we
carried on with jobs on the boat. Anne made a mosquito net for one of the
windows and Stephen worked on the shower. Unfortunately we have now realised it
is a much bigger job than we thought – so we are evaluating our options!! This evening we enjoyed dinner out on deck (well to be
honest it’s too hot to eat in the saloon!) After dinner we heard a few
fireworks. We had heard it was a fiesta in Javea today so we thought it was to
do with that. Then when lots of fireworks went off and there was a lot of
cheering going on we realised it was the football – |