18-Jun-23 Fiskardo

Westralia
Steve Coughlan
Sun 18 Jun 2023 06:00

We spent the day at Fiskardo. Early in the morning I brought the dinghy plastic fuel tank aboard. I vented any remaining fumes in the tank using the heat gun on low heat then, using a redundant HDPE fitting as a source of plastic, I used the electric rope cutter to plastic weld the small hole over. Worked a treat. Cemal and I then returned to shore and organised a taxi to take us to the nearest petrol station to get fuel (8km away). We then returned to the port, connected the fuel tank. Job done. We then mixed the epoxy resin and refitted the helm seat. Early afternoon we weighed anchored and berthed stern to at the town quay, as ferries were imminent.

 

At anchor, Fiskardo

 

Lunch ashore

 

Fiskardo

 

 

 

A picture containing outdoor, boat, sky, ship

Description automatically generated

Berthed at town quay

 

A picture containing ship, sailing, boat, hook

Description automatically generated

Helm seat reattached with high quality Bison Power marine epoxy adhesive

 

A picture containing outdoor, boat, text, sailing

Description automatically generated

 

 

Steve Coughlan
Executive Chairman
Perth

Level 2 Bravo Building
1 George Wiencke Drive
Perth Airport WA 6105, Australia
P+61 8 9270 1000  M+61 418 935 451
byrnecutmining.com