3 September 1400 depart Kryoneri

Westralia
Steve Coughlan
Sat 3 Sep 2022 14:00
Swam the 450m to shore with some coins in my pocket for a coffee and freshly squeezed OJ then back to boat.

Planned to depart at 12:30pm but dinghy rope broke on engine side so had to lower and replace rope, which required threading it through the davit sheaves which are difficult to access. Rated at 780kg BL, it was double sheaved so should have held +1.5t. It failed midway, not at the eye splice so a bit of a mystery.

Image

780kg x 2 rope dinghy lift failed mid point on heavy (outboard  side of dinghy). Bit of a mystery as no obvious damage to rope.
Steve Coughlan
Executive Chairman
Perth

Level 1 Bravo Building
1 George Wiencke Drive
Perth Airport WA 6105, Australia
P+61 8 9270 1000  M+61 418 935 451
byrnecutmining.com