Pix 27 May 42:25.924N 18:41.565E
Boat lifted at about 1030am. Motored around to Porto Montenegro and berthed. Filled up water tanks. Noted water leakage from Hansgrohe thermo mixers in both heads. Both the thermal mixer
control ends had come adrift for some reason. Downloaded new software for the Maxsea Timezero charts and Furuno GPS. Removed WL510 for shipping back to Malcolm Lane in UK. Noted additional water leak in forward head. Checked behind panel in lower cupboard
below sink in forward head and noted push in connection had come adrift. Refitted. All good. Fridge compressor was not working, John noted loose wire and reconnected, all good. In the evening we headed off to the very impressive Porto Montenegro yacht club
to watch the America's cup on the big screen. Met the Australian Manager of Porto Montenegro, Tony Brown, good bloke from Tassie. Had dinner at Japanese restaurant. Lift prepared Off to the water Steady, steady Lowering Not a lot of room! Berthed at Porto Montenegro America’s cup on the big screen |