And 4 days later the mast and it's new rigging was ready to put back on to the boat.  But the crane was not available until the following day  The crane arrived at 11.35 and Demir had the mast stepped with shrouds attached by 12.25! :-
 
 
 
 
There's not much holding the mast.  They wrapped a bit of old blanket around the head of the crane to avoid damaging the anodised coating.  All high tech stuff:-
 
 
 
 
Lots of delicate fittings and cables to protect while supporting the base as the mast is being lifted:-