Preps for the return crossings

RAVEN - Atlantic Circuit 2021-22
Richard Foulkes
Sat 26 Mar 2022 09:38
As the Caribbean cruising phase draws to a close over the next 10 days, it is time to ensure RAVEN is in good shape for the ocean legs ahead.
A rigging check was done yesterday, all found in good shape overall but inevitably a few tweaks to be done.
Divers are booked for week after next to do a hull clean and check. We have been doing some cleaning of weed near the waterline, but the lurking barracudas are not conducive to going too far down!

JPEG image

JPEG image