3rd May
Mike was on board at 0615 this morning and he fitted the
bilge pump monitor whilst John sweated hard in galley over bacon, eggs and
coffee. The monitor was in place within two hours – AND we had breakfast
in the process. Mike is top notch and probably did it in a quarter of the time
in would have taken John. He then went back to First Light and left John to set
up the systems – all electronic – and this took longer than
installing the equipment – fortunately both only need doing once. Mike
returned at 1200 and boxed up the installation and we sat around for an hour
chatting before John accompanied him across to First Light and let their lines
go for the passage to |