Passage to Cheasapeake River position 39:30.47N 75:54.34W

Symatchmaker
Tue 6 Oct 2009 12:25
Rounded Cape May into the Delaware at 1800hrs the evening of 4th Oct...
 
Day 3 Into the Upper Cheasapeake
 
Midnight saw us at the top of the Delaware river, and we turned SW into the wide C&D Canal a 12 mile long sea level canal linking the Delaware river to the Cheasapeake. It was opened in 1829 at a cost of $2.5M. It is over 450feet wide and the bridges are 128 feet - Matchmaker has a water level clearance of 98 feet and as we went under the bridges we all held our breathe.... in the still evening with full moonlight and 3 meters of fog hanging on the water it was a mystic sight!
 
At 00.30hrs we heard the slow drawl of the night watchman at the railway bridge annouce the lowering of the rail lift bridge. We slowed right down and the favourable tide still pushed us along at 4 knots. After 20 minutes the same dull voice confirmed "Draw bridge open" and we motored through. We entered the Elk River - mile zero of the Cheasapeake  Waterway.
 
Sylvian country - gunkholes catfish and reedy shoals and oak tree hillocks. All in a silky moonlight. 
 
Fog got really thick along the banks of the upper Chesapeake. We motored slowly down the Elk river the ebb tide giving us a helping 1.5knots under the keel. Out into Chesapeake bay proper and 48 miles later rounding upinto Annapolis and Bert Jabis Yard.
 
All very still and quiet... beautiful crystal cleat October morning.
Scot cooked up the "Matchmaker" Special Breakfast - a subtle combination of Scrambled eggs Turkey strips American cheese and hash browns... yum yum.
 
Passage 386 miles - 39 hours .... very fast!
 
 

JPEG image

JPEG image