Follow up

LEGACY
Annick & Patrick LE GOFF
Thu 20 Feb 2014 23:39
9:36.578 N , 79:36.537 W
After almost 24 hours sitting on the rudder post , the “marina” managed to raise the rear of the boat with an inflatable balloon, dragged the boat back in the water. Thankfully, we did not got hurt  when the boat felt, and beside the rudder , we have no other damage. A heavy load was on the combination  rudder shaft/ tube/bearing. It definitely could have been  worse. We are floating dry, rudderless ( as we get a temporary fix ). Parts are ordered from France, thanks to the Superb Beneteau USA / France after sales team . We are  carefully reviewing our agenda with concern on the weather the other side  with a 2 months or three behind schedule.
 
Apres plus de 24 heures s’appuyant sur la meche du safran, la “marina” a reussi a monter l’arriere du bateau avec un ballon gonflable, et pousser le bateau dans l’eau. Heureusement nous n’avons pas ete blesse pendant la chute et a part le safran , nous n’avons pas d’autre degats.Il y avait une super pression sur la meche , tube de jaumiere et palier. Cela aurait pu etre pire. Nous flottons sec sans safran (en reparation temporaire). Pieces sont commandees, un grand merci aux superbes services  clientele de Beneteau USA et France. Nous examinons nos options pour le futur avec 2 ou 3 mois de retard.
 
DSCN7741
Legacy (9T) on the left and the POS crippled trailer rated for 16 T,
DSCN7745
Strong rudder...... Safran super costaud