Preparation in Plymouth

Silhouette
Pieter, Pauline, Robyn and Kerry Lindeque
Sat 6 Apr 2013 16:17
"50:20.04N 04:10.07W"


Silhouette is lying in Sutton Harbour marina (Plymouth) with a long list of jobs that need doing before departure (end of July 2013 if all goes to plan). For instance, Pieter installed a second diesel tank, new batteries are ready to go in after the liftout and antifoul, new inner forestay where we can hoist a storm sail was installed, Pauline made lee cloths, etc.

Pieter holds the wifi aerial that works a treat but still needs to be installed.
wifi install.jpg


Robyn and Kerry test our new dinghy 'Shadow'
Shadow.jpg