Preparation in Plymouth
Silhouette
Pieter, Pauline, Robyn and Kerry Lindeque
Sat 6 Apr 2013 16:17
Silhouette is lying in Sutton Harbour marina (Plymouth) with a long list of jobs that need doing before departure (end of July 2013 if all goes to plan). For instance, Pieter installed a second diesel tank, new batteries are ready to go in after the liftout and antifoul, new inner forestay where we can hoist a storm sail was installed, Pauline made lee cloths, etc.
Pieter holds the wifi aerial that works a treat but still needs to be installed.
Robyn and Kerry test our new dinghy 'Shadow'